Achievement
Beneficiation

1.Iran Mobarakeh Sangan iron concentrate concentrating project with an annual output of 5 million tons: EPS, with an annual processing capacity of 10 million tons of raw ore and an annual output of 5 million tons of iron concentrate. The scope of the project includes coarse crushing, 8 km ore belt conveying system, large ore mechanized stockyard, grinding and dressing, product dewatering, and concentrate circular silo. The mechanized bulk ore yard is a rare case in China; SAB process is adopted for grinding and dressing to simplify the crushing process, reduce the floor area, dust points, operators and investment and operation costs; Advanced iron concentrate purification technology, the final iron concentrate grade is 68.5%; The coarse and fine tailings are dewatered separately to reduce the investment and operation cost of tailings dewatering.

Concentration plant under construction

3-D design drawing


23 MTPA mining and dressing project of Cangshan Daqingshan Iron Mine: design and construction management, with an annual processing capacity of 3 million tons of raw ore. The final grade of iron concentrate is 65% by adopting the process of three-stage closed-circuit crushing, coarse crushing, large waste rock tailing, pre-grinding and stage grinding stage separation. For wet tailings, the advanced technology of coarse sand bailing and fine filling is adopted. The coarse tailings are sold as building materials products, increasing the economic benefits of the concentrator, and the fine tailings are cemented and filled to truly realize tailless discharge and green mine.

 

Overall drawing of concentration plant

 

Coarse tailings dewatering                       Pre-separation before wet grinding


3.Shandong Iron and Steel Group Rizhao Co., Ltd. builds a pellet raw material production line: the design project is to process 1.8 million tons of imported high-grade coarse concentrate annually. After two stages of continuous grinding and magnetic separation, the grade of iron concentrate is more than 68%. It adopts advanced iron concentrate dewatering process, the water content of iron concentrate is less than 8%. The project will process the coarse concentrate with low processing cost, good product index, low investment and good economic benefits.

 

Wet continuous grinding

 

Pulp dewatering


4、Inner Mongolia Shuangli Mining Co., Ltd. Huogeqi No. 2 Iron Mine Opencast to Underground Mining and Beneficiation Project: Engineering project, under construction. The annual processing capacity of raw ore is 3 million tons. In view of the characteristics of low grade of raw ore, the process flow of coarse crushing, fine crushing, and wet pre-separation before grinding is adopted to remove 50% of waste rock in advance, realizing more crushing and less grinding, early throwing, reducing the amount of ore into grinding, reducing the amount of fine tailings, increasing the service life of tailings pond, low investment and low operation cost.


5、Other projects


序号
SN.



建设单位及工程名称
Project Description


 


规模
Scale


 


投产日期
Commissioned by


 


备注
Remarks


 

1


山东钢铁矿业有限公司彭集铁矿800万吨/年采选
Pengji 8.0MTPA Iron Ore Mining & Beneficiation Project of Shandong Iron & Steel Group Mining Industry Co., Ltd.



1000万吨/
10MTPA


10


在设计中
Under engineering


E

2


山东兴盛矿业股份有限公司杨庄铁矿开采工程
Yang Village Iron Ore Mining Project of Shandong Xingsheng Mining Industry Co., Ltd.



200万吨/
2.0MTPA


 


在建设中
Under construction


 

E

3


金钢矿业有限责任公司乔普卡铁矿采选工程
Qiaopuka Iron Ore Mining & Beneficiation Project of Jingang Mining Industry Co., Ltd.



150万吨/
1.5MTPA


 

2013.4

E

4


内蒙古汇银矿业有限公司勒马戈山铜多金属矿采选工程
Mountain Lemage Copper Polymetallic Ore Mining & Beneficiation Project of Nei Mongol Huiyin Mining Industry Co., Ltd.



100万吨/
1.0MTPA


 


在建设中
Under construction


 

E

5


山东金鼎矿业有限责任公司王旺庄铁矿150万吨/年扩建工程
Wangwang Village 1.5MTPA Iron Ore Expansion Project of Shandong Jinding Mining Industry Co., Ltd.



150万吨/
1.5MTPA


 

2013.2

E

6


山东胜宏矿业有限公司大张家毛坦铁矿采选工程
Dazhangjia Maotan Iron Ore Mining & Beneficiation Project of Shandong Shenghong Mining Industry Co., Ltd.



120万吨/
1.2MTPA


 

2012.1

E

7


济钢集团石门铁矿露天转地下开采设计工程
Strip Mining Changed to Underground Mining Project of Shimen Iron Ore of Jinan Iron & Steel Group



120万吨/
1.2MTPA


 

2011.12

E

8


莱钢集团冶金辅料工程石灰石矿工程
Limestone Mine Project of Metallurgical Auxiliary Material Project of Laiwu Steel Group



100万吨/
1.0MTPA


 

2007.12

E

9


莱钢型钢公司白云石矿工程
Dolomite Mine Project of Laiwu Steel Section Steel Co., Ltd.



100万吨/
1.0MTPA


2007.8

E

10


济南鲍德冶金石灰石有限公司石灰石矿工程
Limestone Mine Project of Jinan Baode Metallurgical Limestone Co., Ltd.



90万吨/
0.9MTPA


 

2007.1

E

11


山东盛鑫矿业有限公司大高庄铁矿采选工程
Dagao Village Iron Ore Mining & Benefication Project of Shandong Shengxin Mining Industry Co., Ltd.



80万吨/
0.8MTPA


 


在建设中
Under construction


 

E

12

山东镁矿矿山改造产品升级建设项目采选、原料生产线

Mining and dressing, raw material production line of Shandong magnesium mine transformation product upgrading construction project


15万吨/
0.15MTPA


 

2011.1

E

13

山东金岭铁矿福山铜矿王家庄二矿段建设项目

Construction Project of Wangjiazhuang Second Oreblock of Jinling Iron Mine of Shandong Fushan Copper Mine


50万吨/
0.5MTPA


 

2008.2

E